top of page

McKee Home - Project Progress

  • Writer: BMW Construction
    BMW Construction
  • Nov 23, 2025
  • 1 min read

1. Foundation & Footings

The first photo shows the groundwork: footings dug, block piers set, and the full foundation layout completed. This is where accuracy matters most — everything else sits on top of this.


2. Framing Stage

Next, you can see the home fully framed with the roof structure taking shape. This was a complex roof system that required precise measurements and a strong crew to bring it together.


3. Dried-In Stage

Once framing was complete, we installed the roof decking, shingles, house wrap, and windows. This locks the entire structure in and keeps it protected from the weather.


4. Exterior Finishes

The final photo shows the transformation as we added siding, trim, brickwork, porches, and all exterior details. This is where everything starts to look like a finished home.



 
 
 

Comments


  • Facebook
bottom of page